Standardized statutory inspection workflow ensuring zero bias and 100% engineering rigor.
- Stage 1: Digital Application & Architectural Upload — Building plans, structural calculations, and fire drawings.
- Stage 2: Technical Desk Scrutiny — Verification by Chief Technical Examiner's team within 7 working days.
- Stage 3: On-Site Physical Audit — Field inspection by District Safety Officer (DSO) with calibrated NDT tools.
- Stage 4: Compliance / Rectification Notice — 15-day window for addressing any observed discrepancies.
- Stage 5: Final QR-Coded Certificate Issuance — Direct digital delivery to the owner and public repository update.